This is a 17 Lot Industrial zoned subdivision towards the end of Hannon Road, bounding the Waikato Expressway to the south.
23 Aug 2023
This is a residential subdivision within the Norfolk Downs precinct, and a continuation of previous stages undertaken by Transland Developments
This project was a residential subdivision of one of the last blocks of land east of Swayne Road and provided the connections of Rose Leigh Drive ...
19 May 2021
Cogswell Surveys are proud to have provided the design, procurement and construction monitoring services for New Zealand’s first thoroughbred ..
21 Apr 2020
TERRY CAME DRIVE, CAMBRIDGE NORTH Completion of Stages 1 and 2 of this project have been completed and our Planning Team under the guidance of ...
20 Apr 2020
CAMBRIDGE ROAD The C3 structure plan area of approximately 40 ha is the next large tract of land to be opened up for development and Cogswell Surveys ...
The construction of one of the largest industrial buildings ever built in NZ is happening within a new block of land immediately north of the Waikato...
Stages 1 and 2 of this recent project have been completed providing the first 85 sections within this high class large lot residential development..
2 Mar 2018
This project is currently in the first stage of construction involving the development of the first 46 Lots of a planned 200 Lot development to be completed in three stages.
1 Mar 2018
On completion of the Cambridge Section of the Waikato Expressway, HEB Construction engaged Cogswell Surveys to establish Post Construction Settlement Monitoring Pins.
26 Jan 2018
Thornton Park Stage 3 has 10 lots which also includes a cul-de-sac (Brennan Place) and walking access to the reserve which runs parallel to the Waikato Expressway.
This multi award winning project involved the development of 285 large residential sections, with a Commercial area, retirement village ( BUPA ) and several duplex developments within.
This recent project has seen the first stage of construction completed of 16 Lots and planning for the second and final stage underway.
3 Jan 2018
Cogswell Surveys worked with our client and Waipa District Council to design and build the infrastructure necessary to provide the strategic link of Norfolk Drive through to Victoria Road.
13 Feb 2017
Due to a rising school roll and limited room for carpark expansion, Goodwood School was in desperate need of additional land for car parking.
1 Feb 2017
Cogswell Surveys certified the location of the new Hautapu School Pool after being approached by Matt Douglas of Professional Pools.
1 Dec 2016
Approached by Aaron Guerin of LAD Architecture for a price to produce a site plan for Cambridge Primary School director Pete McLachlan decided that this was a project
1 Nov 2016
Cogswell Surveys has recently completed an as built survey of the cycle track at the Avantidrome in Cambridge.